Open Access
Issue |
E3S Web Conf.
Volume 565, 2024
2024 5th International Conference on Urban Engineering and Management Science (ICUEMS2024)
|
|
---|---|---|
Article Number | 01015 | |
Number of page(s) | 4 | |
Section | Urban Construction and Emergency Management Strategy | |
DOI | https://doi.org/10.1051/e3sconf/202456501015 | |
Published online | 09 September 2024 |
- Wang, T., Tang, W., Du, L., Duffield, C. F., & Wei, Y. (2016). Relationships among risk management, partnering, and contractor capability in international EPC project delivery. Journal of management in engineering, 32(6), 04016017. [CrossRef] [Google Scholar]
- Habibi, Mohammadreza, Kermanshachi, Sharareh, Rouhanizadeh, & Behzad. (2019). Identifying and measuring engineering, procurement, and construction (epc) key performance indicators and management strategies. Infrastructures, 4(2), 14–14. [CrossRef] [Google Scholar]
- Zuoyong L., Analytic Hierarchy Process (AHP) and Its Latest Developments [J]. Journal of Chengdu Meteorological Institute, 1992 (04): 82–87. [Google Scholar]
- Wu, Y. (2021). Summary of research on contract risk management of epc general contracting project— based on vosviewer knowledge graph analysis. Springer Books. [Google Scholar]
- Bogner, A., Littig, B., & Menz, W., (2009). Introduction: expert interviews - an introduction to a new methodological debate. Palgrave Macmillan UK. [Google Scholar]
- Zhengqing, L., & Shanlin, Y., (2004). A comparison of several scales in the Analytic Hierarchy Process. Systems Engineering Theory & Practice, 24(9), 10. [Google Scholar]
- Ossadnik, W., & Lange, O., (1999). Ahp-based evaluation of ahp-software. European Journal of Operational Research, 118(3), 578–588. [CrossRef] [Google Scholar]
- Zeng, X. (2010). A Study on the Influencing Factors of Engineering Project Costs Based on the Analytic Hierarchy Process. Shanxi Architecture, 36(1), 2. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.