Open Access
Issue |
E3S Web Conf.
Volume 565, 2024
2024 5th International Conference on Urban Engineering and Management Science (ICUEMS2024)
|
|
---|---|---|
Article Number | 01020 | |
Number of page(s) | 4 | |
Section | Urban Construction and Emergency Management Strategy | |
DOI | https://doi.org/10.1051/e3sconf/202456501020 | |
Published online | 09 September 2024 |
- Yang Yang, Rahman Ali. “Frontiers of Civil Engineering and Disaster Prevention andControl”, CRC Press, 2023 [Google Scholar]
- Road, Liu. (2023) Application research of BIM technology in complex deep foundation pit. Brick and tile, 2024,(06):68–71. DOI: 10.16001/j.cnki.10016945.2024.06.019. [Google Scholar]
- Yang Yang, Sudharshan N. Raman, Bingxiang Yuan, Zhijun Xu. “Advances in FrontierResearch on Engineering Structures”, CRC Press, 2023. [CrossRef] [Google Scholar]
- Qin, Zhang. (2023) Application of BIM + 3 D scanning technology in earthwork survey. Construction Technology, 2023, 54(05): 623–625. [Google Scholar]
- Yapeng, Wang. (2022) 3 D parameter measurement data set of Tianshan spruce backpack lidar. Journal of Agricultural Big Data, 2022, 4(01): 119–124. DOI: 10.19788/j.issn.2096-6369.220118. [Google Scholar]
- Italy, Week. (2023) Discussion on the application of BIM + 3D printing fusion technology in construction engineering. Sichuan Cement, 2024, (03): 57–59 + 65. [Google Scholar]
- Yu Chen, Andreas Benardos. “Advances inMeasurement Technology and DisasterPrevention”, CRC Press, 2024 [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.