Open Access
| Issue |
E3S Web Conf.
Volume 688, 2026
The 2nd International Conference on Sustainable Environment, Development, and Energy (CONSER 2025)
|
|
|---|---|---|
| Article Number | 03002 | |
| Number of page(s) | 9 | |
| Section | Design, Manufacturing, and Maintenance Technology for Sustainable Engineering | |
| DOI | https://doi.org/10.1051/e3sconf/202668803002 | |
| Published online | 20 January 2026 | |
- S. Octavia. Pengendalian inflasi melalui pemetaan pola distribusi produk kebutuhan pokok masyarakat di Kota Tangerang. IKRAITH-Ekon. 8, 684–693 (2025). https://journals.upi-yai.ac.id/index.php/IKRAITHEKONOMIKA/article/view/6608 [Google Scholar]
- S. Nugroho, K. Murtilaksono, S. Soma. PDRB hijau dalam perkembangan wilayah di Kota Depok. Tataloka. 22, 222–235 (2020). https://doi.org/10.14710/tataloka.22.2.222-235 [Google Scholar]
- B. P. Alam. Kebutuhan dan ketersediaan lahan tempat tinggal berdasarkan proyeksi jumlah penduduk di Kecamatan Sukmajaya, Kota Depok. J. Soc. Sci. Res. 4, 7216–7224 (2024). https://j-innovative.org/index.php/ji/article/view/1157 [Google Scholar]
- K. Otasowie, C. Aigbavboa, M. Ikuabe, et al. Barriers to the adoption of Building Information Modeling in quantity surveying practice in South Africa. Proc. Annu. Conf. Int. Group Lean Constr. (IGLC 31). 31, 41–49 (2023). https://doi.org/10.24928/2023/0137 [Google Scholar]
- I. Musonda. The strategic application of Building Information Modelling (BIM) to the role of construction project management. Proc. Creative Constr. Conf. 2019, 470–479 (2019). https://doi.org/10.3311/ccc2019-065 [Google Scholar]
- Ö. H. Bettemir. Development of spreadsheet-based quantity take-off and cost estimation application. J. Constr. Eng. Manag. Innov. 1, 108–117 (2018). https://doi.org/10.31462/jcemi.2018.03108117 [Google Scholar]
- A. Fazeli, M. S. Dashti, F. Jalaei, M. Khanzadi. An integrated BIM-based approach for cost estimation in construction projects. Eng. Constr. Archit. Manag. 28, 2828–2854 (2021). https://doi.org/10.1108/ECAM-01-2020-0027 [Google Scholar]
- E. Aprillia, I. N. D. Pahang Putra. The implementation of BIM Tekla Structure on quantity take-off for structural works of X building project. J. Tek. Sipil 17, 13–22 (2024). https://doi.org/10.56444/jts.v17i1.1567 [Google Scholar]
- T. Q. Nguyen, E. C. W. Lou, B. N. Nguyen. A theoretical BIM-based framework for quantity take-off to facilitate progress payments: the case of high-rise building projects in Vietnam. Int. J. Build. Pathol. Adapt. 42, 704–728 (2024). https://doi.org/10.1108/IJBPA-10-2021-0139 [Google Scholar]
- X. Li, C. Wang, A. Alashwal. Case study on BIM and value engineering integration for construction cost control. Adv. Civ. Eng. 2021, 8849303 (2021). https://doi.org/10.1155/2021/8849303 [Google Scholar]
- L. T. Soon, L. S. Wong, M. A. Kamarazaly, et al. Comparison of BIM-based quantities take-off in quantity surveying profession. Plan. Malaysia 22, 150–164 (2024). https://doi.org/10.21837/pm.v22i32.1499 [Google Scholar]
- M. R. Elyano, Yuliastuti. Analysis of clash detection and quantity take-off using BIM for warehouse construction. IOP Conf. Ser. Earth Environ. Sci. 794, 012012 (2021). https://doi.org/10.1088/1755-1315/794/1/012012 [Google Scholar]
- Y. G. Xu, C. Qian. Lean cost analysis based on BIM modeling for construction project. Appl. Mech. Mater. 457-458, 1444–1447 (2014). https://doi.org/10.4028/www.scientific.net/AMM.457-458.1444 [Google Scholar]
- Z. Guo. Research on the application of BIM technology in intelligent construction of engineering projects. Trans. Eng. Technol. Res. 4, 65–71 (2024). https://doi.org/10.62051/gvvxrx91 [Google Scholar]
- V. S. Kumar, S. M. Suban, K. P. Kumar, et al. Application of BIM methodology in Revit for automated quantity take-off and reinforcement estimation. Int. J. Multidiscip. Res. Sci. Eng. Technol. 8, 3092 (2025). https://doi.org/10.15680/ijmrset.2025.0803092 [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.

