Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Solving multi-mode resource-constrained scheduling problem of prefabricated construction using genetic algorithm

Lin-lin Xie, Denghe Li, Sisi Wu and Rui-Dong Chang
Engineering, Construction and Architectural Management (2025)
https://doi.org/10.1108/ECAM-03-2023-0232

Multi-objective optimisation of the level of prefabrication in construction projects

Lucas Goncalves de Moura Jorge, Ahmed W A Hammad, Assed N Haddad, Vivian W Y Tam and Chethana Illankoon
Proceedings of the Institution of Civil Engineers - Engineering Sustainability 1 (2024)
https://doi.org/10.1680/jensu.22.00032

Optimization of Construction Program Schedule Plans Based on Multi-Objective Optimization Theory

Yibiao Liu, Hongqun Cheng and Chenchen Liu
Iranian Journal of Science and Technology, Transactions of Civil Engineering 46 (6) 4763 (2022)
https://doi.org/10.1007/s40996-022-00865-2

New Automated Activity-on-Node Calculation Grading Method for Construction Management Education Innovation

Ran Ren, Jiansong Zhang and Yi Jiang
Journal of Civil Engineering Education 147 (3) (2021)
https://doi.org/10.1061/(ASCE)EI.2643-9115.0000043

Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm

Linlin Xie, Yajiao Chen and Ruidong Chang
Applied Sciences 11 (12) 5531 (2021)
https://doi.org/10.3390/app11125531