Issue |
E3S Web Conf.
Volume 53, 2018
2018 3rd International Conference on Advances in Energy and Environment Research (ICAEER 2018)
|
|
---|---|---|
Article Number | 02003 | |
Number of page(s) | 4 | |
Section | Energy Equipment and Application | |
DOI | https://doi.org/10.1051/e3sconf/20185302003 | |
Published online | 14 September 2018 |
Improvement and application of hole-sealing technology across seams in Song Zao coal mine
1
School of Energy Engineering, Long-Dong University, Qing'yang 745000, China
2
China Coal Technology and Engineering Group Chongqing Research Institute, Chongqing 400037, China
Through the analysis on the drilling hole gas drainage effect(2225 working face crossing seam drainage, K2air way drilling field layout, crossing seam drainage gas in K3b coal seam),it is found that hole sealing technology directly affects gas drainage. Based on the original hole sealing technology and combining with field conditions, an improved drilling scheme for transportation roadway was proposed, considering the drilling layout, sealing material and depth, grouting time, pre-plunging depth. Test results of the scheme showed that, with a rise in the cost and drilling pressure relief time, the pressuring-relief gas drainage amount was greatly increased, the drilling field pre-pumping concentration was enhanced to 4.4times, the drainage efficiency was improved.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.