Analysis of financial risk of a hard coal mine participation in DSR mechanisms in Poland – a case study
1 Mineral and Energy Economy Research Institute, Polish Academy of Sciences, 7A Wybickiego St., 31-261 Cracow, Poland
2 AGH University of Science and Technology, 30 Mickiewicza Ave., 30-059 Cracow, Poland
* Corresponding author: piotrolczak@hotmail.com
The paper analyses possibilities of a hard coal mine operation as an electricity consumer capable of reducing instantaneous demand for electric power in the case of a Demand Side Response (DSR) call. The analyses considered the risk of service provision or non-provision based on the 2018 data on the electricity consumption and on parameters of the Polish power system. The analyses applied to two types of DSR participation programmes: guaranteed and current, and to an example of hard coal mine from the area of the Upper Silesia, which ordered power was 20 MW. For the current programme (without fines for service non-provision) the optimum value – from the financial risk point of view - was calculated as 6 MW, and for the guaranteed programme results were determined depending on the ratio of price for service provision to the fine for non-provision.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.