Issue |
E3S Web Conf.
Volume 123, 2019
Ukrainian School of Mining Engineering - 2019
|
|
---|---|---|
Article Number | 01014 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/e3sconf/201912301014 | |
Published online | 22 October 2019 |
Issues of photovoltaic installation size choice for a hard coal mine
1 Mineral and Energy Economy Research Institute, Polish Academy of Sciences, 7A Wybickiego St., 31-261 Cracow, Poland
2 AGH University of Science and Technology, 30 Mickiewicza Ave., 30-059 Cracow, Poland
* Corresponding author: piotrolczak@hotmail.com
Poland is the leader in hard coal mining in the European Union and in generation of electricity on this basis, it is related also to low generation of energy from renewable energy sources, in particular photovoltaic installations. The paper analyses the potential of PV installations application for the needs of a selected hard coal mine from the Upper Silesian Coal Basin. Using the hourly data on its electricity consumption in 2018 various sizes of PV installations were selected, a simple payback period was calculated as well as the percentage of energy from the installation use for the current mine operations. It has been shown that in the case of a mine, having available 20 MW of ordered power and average consumption of approx. 14 MW, an installation of 20 MWp rating covers approx. 15% of the electricity demand per year, while for 1 o’clock p.m., i.e. the hour at which most frequently the peak consumption occurred, the share in electricity demand coverage by the PV installation of this power on average amounts to approx. 50% per year.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.