Issue |
E3S Web Conf.
Volume 139, 2019
Rudenko International Conference “Methodological problems in reliability study of large energy systems” (RSES 2019)
|
|
---|---|---|
Article Number | 01038 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/e3sconf/201913901038 | |
Published online | 16 December 2019 |
An adaptive single-phase reclosing of line in the scheme with intermediate system
Novosibirsk State Technical University, Automated Electrical Power Systems Department, 630073, Novosibirsk, Russian Federation
* Corresponding author: jononaev.87@mail.ru
Providing the reliability of adaptive single-phase reclosing (ASPR) in line equipped with any number of shunt reactors (SR), including the case of their absence, are considered and analyzed in this paper. The essence of the proposed work is that in order to provide high reliability of ASPR, is carry out short-term (for 0.1 seconds) one-sided switching on of the emergency phase from the side of the intermediate system, is measuring the current value of the current of this phase at the switched end and comparing it with the specified setpoint. If the current is higher than the specified setpoint, then a short or arc fault is detected in the phase and then it gives a command to disconnecting the line, otherwise it is not a short circuit in the phase and it is successfully will turned on to work on the other side of the line.
Key words: adaptive single-phase reclosing / weak intermediate system / input resistance argument / controlled current in the emergency phase
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.