Issue |
E3S Web Conf.
Volume 164, 2020
Topical Problems of Green Architecture, Civil and Environmental Engineering 2019 (TPACEE 2019)
|
|
---|---|---|
Article Number | 03002 | |
Number of page(s) | 10 | |
Section | Energy Efficiency in Transportation | |
DOI | https://doi.org/10.1051/e3sconf/202016403002 | |
Published online | 05 May 2020 |
Industrial heritage along railway corridor: a gear towards tourism development, a case study of Lampang Province, Thailand
Faculty of Architecture, Silpakorn University, Wang Tha Phra Campus, 31, Na Pralan Rd., Phra Borom Maha Ratchawang, Phra Nakhon, Bangkok 10200, Thailand
* Corresponding author: rain071_@hotmail.com
This study investigated industrial heritage elements and associated landscapes along the railway corridor of Lampang Province, Thailand, and potential (re)uses for tourism development by approaches in relation to the industrial heritage concept. The study employed the qualitative approach utilizing field surveys and focus group discussion with key informants, and an additional questionnaire- based survey. The findings highlight significant potential of mining and railway heritage that can be developed for tourism in the future. The study proposed alternative approaches for future interpretation, with a remark addressing that more research is required, as academic studies in this field still lack, in order to advance the academic and practical areas of the industrial heritage in Thailand.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.