Optimal Design and Practice of the Construction Scheme for Laying the Whole Track Bed on the Subway Ballastless Track
1 Surveying and Mapping Engineering Department, Yellow River Conservancy Technical Institute, Kaifeng, Henan, 475001, China
2 Bone Surgery Department, Hui Hospital, Kaifeng, Henan, 475000, China
* Corresponding author’s e-mail: 1400167862@qq.com, chenhuii_521@sina.com
In the development of modern society, our country attaches more importance to the development of the construction industry, and strengthens the supervision, so that the construction industry can be developed to the mode of industrialization. That combining with the construction needs of prefabricated concrete assembly in our country and taking comprehensive analysis of various factors and application, can enhance the structural stability and safety of prefabricated concrete assembly, thus can meet the needs of the modern building industrialization development, and improve the overall quality and efficiency. In the development of subway transportation field, laying the whole track bed of Ballastless track is an important core work, which is the new construction of rail transit. This paper made perfect management system, carried out all kinds of work, improved the construction technology of the whole track bed and perfected the construction plan, with the result of prolonging the service life of the subway ballastless track and promoting the stable development of modern society in our country.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.