Open Access
Issue
E3S Web Conf.
Volume 165, 2020
2020 2nd International Conference on Civil Architecture and Energy Science (CAES 2020)
Article Number 04003
Number of page(s) 6
Section Civil, Architectural Engineering
DOI https://doi.org/10.1051/e3sconf/202016504003
Published online 01 May 2020
  1. Sun,L. (2016) Construction Technology Of Double Block Ballastless Track Integrated Roadbed In Railway Tunnel.J.Journal of Railway Engineering,33(12):48-52. [Google Scholar]
  2. Chen,J.G. (2010) Construction Technology Of Double Block Ballastless Track Integrated Roadbed In Railway Tunnel.J.Shanxi Architecture,36(26):301-302. [Google Scholar]
  3. Tian,W.J.(2019) The Construction Method of Integral Track Bed for Double Block Ballastless Track.J.Construction & Design for Engineering,14:151-152. [Google Scholar]
  4. Wang, Y.J. (2018) Study on Construction Technology and Application Effect of Ballastless Track Integral Track Bed. Industrial & Science Tribune,17(22):55-56. [Google Scholar]
  5. Zhang, T.P .(2017) Study on Construction of Short Sleeper Type Integral Track Bed.Harbin Railway Technology,3: 4-6+9. [Google Scholar]
  6. Hu, M.(2018) Construction of Double Block Ballastless Track with Tool Track Method. Management & Technology of SME,10:175-176. [Google Scholar]
  7. Yu, P.(2019) The Design of the Integral Track Bed with Bar Sleeper for Urban Rail Transit.Urban Mass Transit, 5:171-174. [Google Scholar]
  8. Zhang, M.(2017) Study on the design of new continuous block sleeper for urban rail transit. Railway Engineering, 11:122-125. [Google Scholar]
  9. Zhang, T.(2018) Construction Technology of Large Span Steel Truss Cable-stayed Bridge of Urban Rail Transit. Modern Urban Transit,11: 30-33+37. [Google Scholar]
  10. Xu. L.Y.(2017) Construction Technology of Steel Spring Floating Plate Integral Track Bed in Urban Subway Engineering. Building Technology Development, 3: 58-59. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.