Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 01011 | |
Number of page(s) | 4 | |
Section | Development, Utilization and Protection of Traditional Energy Resources | |
DOI | https://doi.org/10.1051/e3sconf/202123601011 | |
Published online | 09 February 2021 |
The state evaluation method of distribution switch cabinet based on improved matter-element extension
1 Liaoyang Power Supply Branch of State Grid Liaoning Electric Power Co., LTD, Liaoyang, 111000, China
This work was supported in part by science and technology project of Liaoning province state grid corporation of China (2020YF-09)
* Corresponding author:yao_jc@126.com
In this paper, a matter-element extenics method is adopted to combine the information of each layer and each eigenvalue, so as to realize the evaluation of the current state of switch cabinet. The calculation of correlation degree is improved in the traditional matter-element extenics method. And the actual evaluation effect is optimized. This paper illustrates the evaluation process with practical examples, and compares the current evaluation results with the actual status of switch cabinets and the evaluation results obtained by traditional matter-element extension method. They proved the advance and effectiveness of the proposed method.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.