Labor costs management in the large-block construction of NPP
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: morozenkoaa@mgsu.ru
The article continues the research of the features of the use of prefabricated cast-in-place structures in the construction of nuclear power plants (NPP), the organizational and economic feasibility of the use of prefabricated cast-in-place structures in the implementation of new projects for the construction of nuclear power plants. The estimation of labor costs and resource costs of installation of large-block structures for the reactor building of the NPP was made. The dependence of labor costs for the installation of reinforced blocks, depending on the share of using reinforced blocks during the construction of the reactor building of a nuclear power plant, was obtained. The dependence of the overall labor costs for the industrial production and installation of reinforced blocks, depending on the share of using reinforced blocks during the construction of the reactor building of a nuclear power plant, was obtained. Graphical representations of dependencies are illustrated. The main daily resource consumption for the installation of reinforced blocks during large-block construction has been analytically calculated. The data on the required shares of labor costs at industrial enterprises and at the construction site in percentage terms were obtained. The conclusion is made about the rational use of large-block construction in the implementation of NPP construction projects.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.