Issue |
E3S Web Conf.
Volume 8, 2016
Mineral Engineering Conference MEC2016
|
|
---|---|---|
Article Number | 01021 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20160801021 | |
Published online | 16 September 2016 |
Leaching kinetics of gibbsitic bauxite with sodium hydroxide
Central Metallurgical Research and Development Institute (CMRDI), P.O. Box 87 Helwan, Cairo, Egypt
a Corresponding author: eabde2@gmail.com
In this paper the results of a leaching kinetics study of bauxite ore with sodium hydroxide are presented. The effect of ore particle size, sodium hydroxide concentration and reaction temperature on the Al2O3 extraction rate was determined. The results obtained showed that 99% of Al2O3 was leached out using −200+270 mesh ore particle size at a reaction temperature of 105 °C for 60 min reaction time with 250 g/L NaOH. The solid-to-liquid ratio was maintained constant at 1:20. The results indicated that leaching of bauxite is the rate controlling process. The activation energy was determined to be 46.04 kJ/mole, which was characteristic for a chemically controlled process.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.