Issue |
E3S Web Conf.
Volume 8, 2016
Mineral Engineering Conference MEC2016
|
|
---|---|---|
Article Number | 01046 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/e3sconf/20160801046 | |
Published online | 16 September 2016 |
Production value optimization with intermediate jig product recirculation
Silesian University of Technology, Department of Electrical Engineering and Control in Mining, 44-100 Gliwice, ul. Akademicka 2, Poland
a Corresponding author: Joachim.Pielot@polsl.pl
The paper describes the result of the production value increase in systems with two and three jigs and recirculation of the interemediate product compared to the output value obtained from a single jig. The increase is greater when the reference ash content in the concentrate is lower.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.