Issue |
E3S Web Conf.
Volume 22, 2017
International Conference on Advances in Energy Systems and Environmental Engineering (ASEE17)
|
|
---|---|---|
Article Number | 00121 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/e3sconf/20172200121 | |
Published online | 07 November 2017 |
Shortcut nitrification/partial nitritation start-up for reject water treatment in a SBR
Faculty of Environmental Engineering, Wroclaw University of Science and Technology, Wybrzeże Wyspiańskiego 27, 50-370 Wroclaw, Poland
* Corresponding author: mateusz.muszynski-huhajlo@pwr.edu.pl
For many wastewater treatment plants (WWTPs), side-stream treatment of reject water from digested sludge dewatering is a feasible opportunity to improve N-removal efficiency without costly plant expansion. Biological nitrogen removal over nitrite or combined partial nitritation (PN)-Anammox process has recently become a popular treatment method for such ammonium-rich streams. Shortcut nitrification and PN start-ups were successfully performed in a pilot-scale SBR treating real reject water. In all performed experiments, effective nitrate production inhibition occurred in less than 20 days due to operational conditions selection and without advanced control system. pH adjustment in the PN reactor allowed to achieve NO2-N /NH4-N ratio suitable for Anammox process (1.24±0.07).
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.