Issue |
E3S Web Conf.
Volume 33, 2018
High-Rise Construction 2017 (HRC 2017)
|
|
---|---|---|
Article Number | 02036 | |
Number of page(s) | 6 | |
Section | 2 Engineering Systems and Building Materials | |
DOI | https://doi.org/10.1051/e3sconf/20183302036 | |
Published online | 06 March 2018 |
New technology of underground structures the framework of restrained urban conditions
1
National University of Science and Technology (MISiS), Leninskij Av., 4, Moscow, 119991, Russia,
2
Rostov State Transport University, Rostovskogo Strelkovogo polka sq., 2, Rostov-on-Don, 344038, Russia,
3
Don State Technical University, pl. Gagarina, 1, Rostov-on-Don, 344022, Russia
* Corresponding author: mixail-stepan@mail.ru
In the paper was indicated the essentiality of large-scale underground space development and high-rise construction of cities in Russia. The basic elements of transport facilities construction effective technology without traffic restriction are developed. Unlike the well-known solutions, it offers the inclusion of an advanced lining in the construction that strengthens the soil mass. The fundamental principles of methods for determining stress in advanced support and monitoring of underground construction, providing the application of pressure sensors, strain sensors and displacement sensors are considered.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.