Issue |
E3S Web Conf.
Volume 33, 2018
High-Rise Construction 2017 (HRC 2017)
|
|
---|---|---|
Article Number | 02044 | |
Number of page(s) | 12 | |
Section | 2 Engineering Systems and Building Materials | |
DOI | https://doi.org/10.1051/e3sconf/20183302044 | |
Published online | 06 March 2018 |
Research on Chinese Intelligent Guanglianda in High-rise Construction
1
Peter the Great St. Petersburg Polytechnic University, 195251, Polytechnicheskaya, St.Petersburg, 29, Russia
2
Institute of Civil Engineering, China University of Mining and Technology, No.269, Liberation south road, Xuzhou, Jiangsu, China
3
Institute of Civil Engineering, Southwest Jiaotong University, No. 111, North 1 st Section of Second Ring Road, Jinniu District, Chengdu, Sichuan, China
4
Civil Engineering Department, Xi`an Jiaotong University, 28 Xianning West Road, Xi`an, Shaanxi, China
5
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: luke1996@stu.xjtu.edu.cn
Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage), the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.