Issue |
E3S Web Conf.
Volume 33, 2018
High-Rise Construction 2017 (HRC 2017)
|
|
---|---|---|
Article Number | 03032 | |
Number of page(s) | 7 | |
Section | 3 Construction Technology and Management | |
DOI | https://doi.org/10.1051/e3sconf/20183303032 | |
Published online | 06 March 2018 |
Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
1
Voronezh State Technical University, Moscow Avenue, 14, Voronezh, 394026, Russia
* Corresponding author: ipocebneva@vgasu.vrn.ru
This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.