Issue |
E3S Web Conf.
Volume 38, 2018
2018 4th International Conference on Energy Materials and Environment Engineering (ICEMEE 2018)
|
|
---|---|---|
Article Number | 01035 | |
Number of page(s) | 5 | |
Section | Environmental Science and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/20183801035 | |
Published online | 04 June 2018 |
The Location Analysis on Dry Port of the Inland in Jinan City
1
Shandong Institute of Transportation Science, Jinan, Shandong 250023, China
2
Shandong Hi-speed Group Co., Ltd, Jinan, Shandong 250013, China
* Corresponding author: mxr6465201@126.com
The port competition is more and more intense, starts to be the initial infrastructure and the operation ability competition, now is in the port economy hinterland competition. Dry Port has the functions of customs declaration, forwarder, inspection and quarantine, warehousing, loading and unloading, circulation processing etc. At present, the construction and layout of the inland dry port, the possibility and feasibility of construction are the focus of the research. The location of dry port in Jinan is fully analyzed on the basis of reference to the advanced operation mode and development experience of the excellent non-water port in the country and abroad. This paper first analyzed Location factors; Then center of gravity method were analyzed. Finally, the location of the dry port is determined.
© The Authors, published by EDP Sciences, 2018.
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.