Technique policy for concurrent development of natural and artificial water flooding of strong edge water reservoir: A case study of central layer Yu-III of Akshabulak oilfield
PetroChina Research Institute of Petroleum Exploration & Development, Beijing, China
The central layer Yu-III in Akshabulak oilfield is a sandstone reservoir with strong edge water, whose major development characteristics are high oil recovery rate and heterogeneous water invasion. Aiming at this problem, the development policy chart of concurrent displacement of natural water and injected water is established on the basis of material balance principle. Injection-production ratio and oil recovery rate are the main controlling factors for the concurrent displacement of natural water and injected water. Each injection-production ratio corresponds with only one rational oil recovery rate, and the rational oil recovery rate increases with the injection-production ratio. When the actual injection-production ratio of the central Yu-III reservoir is 0.9, the rational oil recovery rate should be 4%.
© The Authors, published by EDP Sciences, 2018.
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.