Issue |
E3S Web Conf.
Volume 40, 2018
River Flow 2018 - Ninth International Conference on Fluvial Hydraulics
|
|
---|---|---|
Article Number | 02050 | |
Number of page(s) | 10 | |
Section | River morphodynamics and restoration | |
DOI | https://doi.org/10.1051/e3sconf/20184002050 | |
Published online | 05 September 2018 |
Sediment management in tidal river: A case study of East Beel Khuksia, Bangladesh
Disaster Prevention Research Institute, Kyoto University, Japan
* Corresponding author: rocky@uh31.dpri.kyoto-u.ac.jp
The widespread construction of coastal embankments limited the natural deposition on the floodplain and accelerated the silt deposition in river channels. It resulted in drainage congestion and large-scale waterlogging problem. The temporary de-poldering is one of the effective methods to solve this issue. During high tide, muddy water enters the selected tidal basin depositing a major portion of sediment and at low tide, relatively clearer water erodes the riverbed. This paper presents a twodimensional numerical model to simulate the mechanism of sediment transport and deposition during the process of controlled flooding. The model was applied to three different scenarios of the embankment cuts in East beel Khuksia, Bangladesh. The study recommends operating single embankment cut at a time if the tidal equilibrium is fulfilled by the opening size of that embankment cut. The developed model can be used to assess the land heightening in sediment-starved tidal basins and ultimately plan the rotation of tidal basins for sustainable sediment management.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.