Issue |
E3S Web Conf.
Volume 44, 2018
10th Conference on Interdisciplinary Problems in Environmental Protection and Engineering EKO-DOK 2018
|
|
---|---|---|
Article Number | 00004 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20184400004 | |
Published online | 03 July 2018 |
Influence of passive house technology on time and cost of construction investment
Gdańsk University of Technology, Faculty of Civil and Environmental Engineering, Department of Metal Structures and Construction Management, Narutowicza 11/12 Str., 80-233 Gdańsk, Poland
* Corresponding author: magdalena.apollo@pg.edu.pl
Due to the changes in the energy standards for housing in Poland there are many concerns. Is the standard required by the regulation achievable and if it is, then at what cost?
There are many solutions to construct a building in line with the requirements of passive house technology. They are differentiated by price and time required for implementation. This study is based on the solution proposed by one of Polish companies, offering technologically integrated products allowing, according to the producer, to build passive houses faster and easier. The goal of this study was to confront producer’s claim with reality by comparing time and cost of the same investment using conventional and passive house technology. The basis for time and cost analysis was a basic detached house design, partially modified with regards to materials and technology used.
Conclusions of the study are based on the comparison of the two Gantt charts defined in Ms Project. Construction schedule was used to analyse the duration of both projects and the resources assignment was used in cost analysis.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.