Issue |
E3S Web Conf.
Volume 44, 2018
10th Conference on Interdisciplinary Problems in Environmental Protection and Engineering EKO-DOK 2018
|
|
---|---|---|
Article Number | 00101 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20184400101 | |
Published online | 03 July 2018 |
Impact of monitoring on the mean time to repair of the water supply network
Institute of Water and Wastewater Engineering, Silesian University of Technology, Gliwice, Poland
*
Corresponding author: magdalena.loj-pilch@polsl.pl
The introduction of monitoring to a water supply network results in reducing its failure rate, increasing its reliability as well as improving the quality of water supplied to consumers, reducing water losses and increasing work safety in a water distribution system. Monitoring enables detection of leakages that could go unnoticed without this system, facilitates detection of leakages and location of failures, i.e. it shortens the repair time — or rather its component — the awaiting-repair time. This paper presents the results of the reliability analysis for a city located in the Upper Silesian Industrial Region before and after the implementation of monitoring to the water supply network.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.