On overhead networks transfer from 10(6) kV to 20 kV
1
Public company «United Energy Company», 115035Raushskaya Naberezhnaya, 8, Russian Federation
2
National Research University «Moscow Power Engineering Institute», 111250Krasnokazarmennaya 14, Russian Federation
* Corresponding author: kirmosh@mail.ru
The expediency of preferential use of the rated voltage of 20 kV for the overhead networks of Russia is investigated. The feasibility study of the 20 kV voltage application areas based on the integrated parameters of the networks was performed. It is shown that due to the convergence of technical and economic characteristics of 10 and 20 kV equipment, 20 kV networks have more significant advantages in comparison with traditional 10 kV electrical installations.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.