Issue |
E3S Web Conf.
Volume 60, 2018
Ukrainian School of Mining Engineering
|
|
---|---|---|
Article Number | 00008 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20186000008 | |
Published online | 16 October 2018 |
Productive flows control in coal mines under the condition of diversification of production
1
National Mining University, Department of Underground Mining, 19 Yavornytskoho Ave., 49005 Dnipro, Ukraine
2
PJSC “DTEK Pavlogradvuhillia”, MA “Pershotravenske”, 76 Soborna Ave., 51400 Pavlohrad, Ukraine
* Corresponding author: mamaykin@yahoo.com
The objective of the work consists in methodical bases of concept development for control by productive flows in coal mines with the use of cost-effective mechanisms. These mechanisms would provide their stable functioning in conditions of uncertainty and risks, formed by internal and external factors. The theoretic views have been used for the supply system structuring, when assessing the opportunities and reasonability to contract out the diversified production operations. The correlation of industrial factors has been defined, representing the mine as a multi-level system, and a logical interpretation of the obtained dependences. The system of efficiency evaluation has been proposed, which is intended to supplement the existing system of risk management with a kind of control element, an indicator of the positive processes in processing technogenic wastes of mines and dressing plants.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.