Issue |
E3S Web Conf.
Volume 118, 2019
2019 4th International Conference on Advances in Energy and Environment Research (ICAEER 2019)
|
|
---|---|---|
Article Number | 02008 | |
Number of page(s) | 5 | |
Section | Energy Equipment and Application | |
DOI | https://doi.org/10.1051/e3sconf/201911802008 | |
Published online | 04 October 2019 |
Research of smart meter design scheme based on IR46
1
Electric Power Research Institute of State Grid Zhejiang Province Electric Power Company, Hangzhou, 310014, China.
2
Hangzhou sunrise Technology Co., Ltd. Hangzhou, 311121, China
3
State Grid Hangzhou Power Supply Company
332794975@qq.com, 705680961@qq.com, 452241362@qq.com, xqmyself@qq.com, xvyongj@126.com, yj_z@sina.com
This paper compares the differences between the International Recommendation46 (IR46 for short) and the current national standards for electric energy meter of the accuracy classes, testing requirements, software protection and so on. The national meter adaptability of IR46 is analyzed, and a technical proposal of dual-core smart meter is advanced. This proposal could match the testing and software protection requirements for IR46, and could implementation in China.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.