Issue |
E3S Web Conf.
Volume 118, 2019
2019 4th International Conference on Advances in Energy and Environment Research (ICAEER 2019)
|
|
---|---|---|
Article Number | 02037 | |
Number of page(s) | 5 | |
Section | Energy Equipment and Application | |
DOI | https://doi.org/10.1051/e3sconf/201911802037 | |
Published online | 04 October 2019 |
Research on Equipment State Management Mode Based on “League System”
1
ENGINEER, Huadian Electric Power Research Institute, NO. 2Xiyuan 9 Road, Hangzhou Zhejiang Province, 310030, China
2
SENIOR ENGINEER, Huadian Electric Power Research Institute, NO. 2 Xiyuan 9 Road, Hangzhou Zhejiang Province, 310030, China
3
SENIOR ENGINEER, Huadian Electric Power Research Institute, NO. 2 Xiyuan 9 Road, Hangzhou Zhejiang Province, 310030, China
4
ENGINEER, Huadian Electric Power Research Institute, NO. 2 Xiyuan 9 Road, Hangzhou Zhejiang Province, 310030, China
* Hankun Bing: bing_hankun@163.com
Under the background of the decline in the hours of operation of thermal power generation equipment, based on Internet technology, a new mode of equipment state management, which integrates equipment responsibility to personnel, continuous tracking and updating of equipment status, and integration of test analysis and processing, A new idea of equipment maintenance for technology sharing, data sharing, and experience sharing has been realized. It has realized the orientation control of the daily work of the professional technicians of power generation enterprises, and at the same time, the equipment status tracking based on the equipment status is further exploration for the field of state maintenance.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.