Issue |
E3S Web Conf.
Volume 124, 2019
International Scientific and Technical Conference Smart Energy Systems 2019 (SES-2019)
|
|
---|---|---|
Article Number | 04003 | |
Number of page(s) | 5 | |
Section | Economics and Energy Management | |
DOI | https://doi.org/10.1051/e3sconf/201912404003 | |
Published online | 25 October 2019 |
Methodical approach to assessing the effectiveness of the management system of thermal power plants in Russia
National Research University “Moscow Power Engineering Institute”, Moscow, Russia
* Corresponding author: infogia2014@yandex.ru
Physical deterioration of thermal power plants based on hydrocarbon fuels leads to technological violations (TV) in their work. Low rates of renewal of thermal generation predetermines the further exploitation of old capacities. In this regard, the activity of the management of energy holdings (EH) is more focused on maintaining the equipment in working condition. The methods, approaches and tools underlying decision-making by the management of energy holding companies are different, respectively, the results of the functioning of the organized management systems (MS) of each company are also different. To assess the effectiveness of the management system it is proposed to use such a generalized indicator as the number of technological violations per year per 1 GW of installed capacity.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.