Open Access
Issue
E3S Web Conf.
Volume 124, 2019
International Scientific and Technical Conference Smart Energy Systems 2019 (SES-2019)
Article Number 04003
Number of page(s) 5
Section Economics and Energy Management
DOI https://doi.org/10.1051/e3sconf/201912404003
Published online 25 October 2019
  1. The largest electric power companies in Russia. Ministry of Energy of the Russian Federation. [Electronic resource]. Access mode: https://minenergo.gov.ru/node/4846 (the date of access 03/05/2019) (2019) [Google Scholar]
  2. History of the company PJSC RusHydro. [Electronic resource]. Access mode: http://www.rushydro.ru/company/history/ (the date of access 03/05/2019) (2019) [Google Scholar]
  3. The history of the company JSC Rosenergoatom Concern. [Electronic resource]. Access mode: http://www.rosenergoatom.ru/about/istoricheskaya-spravka/ (the date of access 03/05/2019) (2019) [Google Scholar]
  4. Share capital of JSC Rosenergoatom Concern. [Electronic resource]. Access mode: http://www.rosenergoatom.ru/shareholders/aktsionernyy-kapital/index.php?sphrase_id=33875 (the date of access 03/05/2019) (2019) [Google Scholar]
  5. Share capital of PJSC RusHydro 2019. [Electronic resource]. Access Mode: http://www.rushydro.ru/investors/stockmarket/capital/ (the date of access 05/05/2019) [Google Scholar]
  6. E.P. Grabchak, I.A. Baikov, E.A. Medvedeva, P.A. Dunaev, The main results of the operation of electric power facilities in 2016. The results of the passage of the 2016-2017 APR. Tasks for the medium term. Ed. Deputy Minister of Energy of the Russian Federation 104 (2017) [Google Scholar]
  7. Informational and analytical report On the operation and development of the electric power industry in 2011. Ministry of Energy of the Russian Federation. [Electronic resource]. Access mode: https://minenergo.gov.ru/node/3399 (the date of access 05/19/2019) (2011) [Google Scholar]
  8. A.B. Zhikharev and N.Y. Posypanko, Research “Modernization of thermal power plants: Maneuver evasion from the market?” Consulting company VYGON Consulting (2017) [Google Scholar]
  9. ITS 38-2017 2017 Burning fuel in large installations for energy production. (Moscow: Bureau of BAT) [Google Scholar]
  10. Information on accidents in power grids and generation. Ministry of Energy of the Russian Federation 2019. [Electronic resource]. Access mode: https://minenergo.gov.ru/node/267 (the date of access 20/05/2019). [Google Scholar]
  11. P.I. Okley, Economic-mathematical methods and models for the design of programs of repair work at thermal power plants (Moscow: Lenand) 266 (2017) [Google Scholar]
  12. GOST R ISO 9001-2015 2015 Quality management systems. Requirements (Moscow: Standartinform) 48 [Google Scholar]
  13. GOST R 55.0.01-2014/ISO 55000:2014 2015 Asset Management. National System of Standards. General understanding, principles and terminology (Moscow: Standartinform) 17 [Google Scholar]
  14. P.I Okley, Prediction of residual life and the probability of equipment failure is the basis for the design of the production program of repair work of a thermal power plant Controlling 65, 54–63 (2017) [Google Scholar]
  15. P.I. Okley Process approach to change management in organizations. Innovation in management 4, 38–44 (2017) [Google Scholar]
  16. P.I. Okley, Matrix model of the study of capital gains and the period of change of equipment of thermal power plants Economic analysis: theory and practice 1, 159–183 (2016) [Google Scholar]
  17. P.I. Okley, Evaluation of the management efficiency of thermal power plants Economy of sustainable development 1, 303–309 (2016) [Google Scholar]
  18. P.I. Okley, Principles of forming a distributed knowledge base for TPPs of energy corporations of Russia Innovative activity 2, 30–35 (2016) [Google Scholar]
  19. Website of the energy holding PJSC “Inter RAO” Access mode: https://www.interrao.ru/ (the date of access 05/24/2019) (2019) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.