Issue |
E3S Web Conf.
Volume 124, 2019
International Scientific and Technical Conference Smart Energy Systems 2019 (SES-2019)
|
|
---|---|---|
Article Number | 05058 | |
Number of page(s) | 4 | |
Section | Additional papers | |
DOI | https://doi.org/10.1051/e3sconf/201912405058 | |
Published online | 10 February 2020 |
Management of technical condition of heat and power facilities based on a risk-oriented approach
1
Kazan State Power Engineering University, 51, Krasnoselskaya st., Kazan, Russia
2
LLC «Modern technologies», 41, G. Kamal st., Kazan, Russia
3
LLC «KER-Avtomatika», 2, Dekabristov str., Kazan, Russia
4
LLC «Center of industrial safety expertise», 90a Ju.Fucik str., Kazan, Russia
* Corresponding author: evgeniya-izmailova@yandex.ru
Ensuring the uninterrupted production of electric and thermal energy is a priority in the generating equipment operation. Nowadays the management of the equipment state at most of Russia’s energy enterprises is based on a system of scheduled preventive maintenance. This system does not allow taking into account the economic component of technological impacts, which, in turn, leads either to “under maintenance” or to “over-servicing” of equipment. All energy companies are faced with the task of optimizing equipment costs, while ensuring the required level of reliability. To solve this problem, production asset management systems are used. The main task of managing production assets is to ensure a balance between equipment costs and the risks of its failure. The result of the implementation of asset management systems is the formation of balanced plans for repairs, replacements, upgrades and maintenance of equipment.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.