Issue |
E3S Web Conf.
Volume 135, 2019
Innovative Technologies in Environmental Science and Education (ITESE-2019)
|
|
---|---|---|
Article Number | 03029 | |
Number of page(s) | 6 | |
Section | Green Architecture and Sustainable Urban Design | |
DOI | https://doi.org/10.1051/e3sconf/201913503029 | |
Published online | 04 December 2019 |
Influence degree of constrained conditions on overhaul of apartment buildings
Moscow State University of Civil Engineering, 26 Yaroslavskoe shosse, Moscow, 129337, Russia
* Corresponding author: FatullaevRS@mgsu.ru
When carrying out the repair and construction work in the apartment buildings and when creating an organizational and technological model, it is necessary to take into account and analyze all the parameters that influence on these works to optimize the time and financial costs. The complicating conditions of the construction works can be caused by the repair work, which are made without the relocation of the residents, the existence of the high-voltage networks, the presence of the constrained conditions, the material storage and etc. In order to give an objective assessment of the organizational and technological model of the repair and construction works, this article proposes to introduce a complex indicator of the constrained condition influence, which quantitatively reflects the influence degree of the set constraint parameter. This model gives a quantitative assessment of the influence degree of the constraint parameters and allows selecting the most effective organizational and technological model for the repair and construction works.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.