Displacement analysis of surrounding rock deformation of Baochang tunnel in Yunnan
1 Shidian Baoshi Expressway Investment and Development Co., Ltd, Baoshan, 678000, China ;
2 China Merchants Chongqing Communications Technology Research & Design Institute Co., Ltd, Chongqing, 400000, China
* Corresponding author’s e-mail: guohongyan@cmhk.com
According to the problem of deformation of surrounding rock when the double-wall method is adopted in the tunnel, the five tunnel monitoring points are set in the tunnel vault, arch waist and arch foot to simulate the tunnel excavation process. The surrounding rock is deformed, and the excavation of the middle guide hole makes the deformation of the surrounding rock reach 7.2mm. After the removal of the middle partition wall, the deformation reaches the maximum, which is 8.4mm. The horizontal displacement starts to increase rapidly, and the maximum is 5.3mm. According to the analysis results, the surrounding rock above the tunnel should be reinforced in time, and the deformation of the surrounding rock after the removal of the middle partition wall should be paid attention to ensure the construction safety and provide reference for future construction.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.