Evaluation of a Tunnel Underpass Building Scheme in Yunnan Province
1 Shidian Baoshi Expressway Investment and Development Co., Ltd, Baoshan, 678000, China
2 China Merchants Chongqing Communications Technology Research & Design Institute Co., Ltd, Chongqing, 400000, China
3 Chongqing Jiaotong University, Chongqing, 400000, China
* Corresponding author’s e-mail: 1559039300@qq.com
Side-crossing residential buildings in tunnel construction may lead to building subsidence, structural damage by tension and affect the use of buildings. Aiming at the structural damage caused by the side-crossing structure of Re Shuitang Tunnel NO.1, by simulating the influence of tunnel construction on the building, it is concluded that the surrounding rock above the tunnel will be deformed when the tunnel crosses the building. The maximum horizontal displacement is 0.64 mm and the maximum vertical displacement is 4.43 mm. According to the analysis results, the surrounding rock above the tunnel should be strengthened in time, and attention should be paid to the impact of blasting on residential buildings, so as to ensure the safety of buildings and provide reference for future construction.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.