Joint adjustment by CPIII precision trigonometric elevation control network assisted with precision levelling observation
1 Faculty of Geomatics, Lanzhou Jiaotong University, Lanzhou 730070, China
2 National-Local Joint Engineering Research Center of Technologies and Applications for National Geographic State Monitoring
3 Gansu Provincial Engineering Laboratory for National Geographic State Monitoring, Lanzhou 730070, China
* Corresponding author: e-mail: 13919054839@163.com
Using the precision trigonometric elevation instead of the precision levelling to build a CPⅢ elevation control network will greatly increase the speed of CPⅢ control network construction. However, the accuracy of CPIII precision trigonometric elevation control network is still difficult to reach the level of CPⅢ precision levelling network. Based on the existing parameter method, this paper introduces some precision levelling for joint adjustment, and uses Helmert’s variance estimation method to perform strict weight determination. Our experiments show that when the number of precision levelling participating in the joint adjustment exceeds 1/3 of the total number of CPⅢ precision levelling network observations, the accuracy of the CPIII precision trigonometric elevation control network can be effectively improved.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.