Issue |
E3S Web Conf.
Volume 174, 2020
Vth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01034 | |
Number of page(s) | 6 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202017401034 | |
Published online | 18 June 2020 |
Contact grouting taken into account when calculating arched frame supports
T.F. Gorbachev Kuzbass State Technical University, 28, Vesennyaya street, Kemerovo, 650000, Russian Federation
∗ Corresponding author: ipeb@kuzstu.ru
One of the current trends in the technology of supporting capital and preparatory workings is the use of contact grouting. The contact grouting is designed to increase the bearing capacity of the frame supports. The paper considers a method for calculating the support pressure and the displacement of the support crown. The calculation method is based on the interaction of the system of blocks “support – filling layer - broken rock layer - undisturbed rock”. The following factors were taken into account in the method of calculating the frame arch support: depth of the roadway development, mine working cross-section, the support section, the width of the filling layer and its deformation characteristics, as well as the deformation and strength characteristics of the rock mass. Checking of the support strength state is done by comparing the calculated load versus the rated bearing capacity of the support. The developed technique allows making the choice of support in various mining conditions of the application.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.