Issue |
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
|
|
---|---|---|
Article Number | 02011 | |
Number of page(s) | 5 | |
Section | Structural Engineering Monitoring, Control, Repair and Reinforcement | |
DOI | https://doi.org/10.1051/e3sconf/202019802011 | |
Published online | 26 October 2020 |
Design and Construction of the Circular Shape Shaft Using the Reverse Construction Method
* Corresponding author: tangzq1974@sina.com
Restricted by the environment and the city’s planning, some pipe jacking used for the HV cable tunnel have to pass through some roads which has been build. Different kind of equipment has certain applicability in the pipe jacking construction procedure, especially with the geological condition, and encountering in the boulder is a common problem in the residual soil or in the strong weathered rock stratum, in this situation, a vertical shaft is needed to remove the boulder. In order to save the site area, a new shaft which is in circular shape is designed, and this paper introduces the main procedure of how to design and construct the new circular shaft. In a Fuzhou HV cable tunnel, the new shape shaft clears away the stone in the clay successfully, and reduces the impact on the ground traffic, the design and construction procedure of the new shaft have been analyzed in this paper, which provides reference for similar construction.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.