Issue |
E3S Web Conf.
Volume 209, 2020
ENERGY-21 – Sustainable Development & Smart Management
|
|
---|---|---|
Article Number | 04001 | |
Number of page(s) | 6 | |
Section | Session 3. Interstate Energy Interconnections, Global Energy Interconnections | |
DOI | https://doi.org/10.1051/e3sconf/202020904001 | |
Published online | 23 November 2020 |
Russia’s electric power reintegration with Central Asia and Caucasus and entering South Asia and Middle East electricity markets
Melentiev Energy Systems Institute of Siberian Branch of the Russian Academy of Sciences, Irkutsk, Russia
* Corresponding author: spodkovalnikov@isem.irk.ru
Results of the next round of studies on Russian interstate electric ties are described. A part of the Eurasian region including European and Siberian part of Russia and countries of Central Asia, Caucasus, Southern Asia and Middle East is considered for 2040 target year. Great effectiveness of creation of interstate power grid in this region is shown.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.