Hydro Power Plants in the Interconnected Power System of Siberia: Trends and Problems
1 D.Sc., Head of the Laboratory of Hydropower and Water Management Systems, Melentiev Energy Systems Institute, Siberian Branch of the Russian Academy of Sciences
2 post-graduate student at Melentiev Energy Systems Institute, Siberian Branch of the Russian Academy of Sciences
The paper discusses the trends, features, and current problems of the operation of hydro power plants in the interconnected power system (IPS) of Siberia. The main feature of the IPS of Siberia is a high proportion of hydro power plants and, as a result, a strong dependence of power generation on the natural fluctuations of water inflows into reservoirs. The problems affecting the power system efficiency arise when the inflows deviate from normal and close-to-normal values. The study indicates the need to improve the current system of managing and planning the operation of hydro power plants. The important factor that can increase the efficiency and reliability of the power system operation is bringing the permissible ranges of variations in reservoir levels in compliance with the design values. Planning the long-term power balances and increasing their validity should involve predictive scenarios of water inflows into reservoirs.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.