Issue |
E3S Web Conf.
Volume 213, 2020
2nd International Conference on Applied Chemistry and Industrial Catalysis (ACIC 2020)
|
|
---|---|---|
Article Number | 03008 | |
Number of page(s) | 4 | |
Section | Environmental Chemical Research and Energy-saving Technology Application | |
DOI | https://doi.org/10.1051/e3sconf/202021303008 | |
Published online | 01 December 2020 |
Research on coordinated controller design method based on fault early warning model
1
Beijing Fibrlink Communications Co, Ltd, Tianjin, 300040, China
2
Customer service center of State Grid Corporation of China, Tianjin, 300300, China
3
State Grid Tianjin integrated energy service Co.LTD, Tianjin, 300456, China
4
State Grid Jiangsu integrated energy service Co.LTD, Jiangsu, 210019, China
* Corresponding author: HBBDndyz@163.com
With increasing degree of power electronics in power system, the interaction between controllers of different FACTS devices poses a greater threat to security and stability of the system. In this paper, a linearized state space model with SVC and STATCOM was established, and the negative interaction mechanism of FACTS device in transient process was analyzed and summarized considering control characteristics, operation mode and setting principle of PI controllers. A model predictive control (MPC) is proposed to replace traditional PI link to establish a coordination controller to overcome the difficulties of PI control parameter setting and global optimization.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.