Issue |
E3S Web Conf.
Volume 217, 2020
International Scientific and Practical Conference “Environmental Risks and Safety in Mechanical Engineering” (ERSME-2020)
|
|
---|---|---|
Article Number | 01005 | |
Number of page(s) | 10 | |
Section | Green Construction and Architecture | |
DOI | https://doi.org/10.1051/e3sconf/202021701005 | |
Published online | 14 December 2020 |
Assessment of conformity of the fire safety of the building of a non-specialized car service
1 National Research Mordovian State University named after N.P. Ogarev, 430005, Republic of Mordovia, Saransk, st. Bolshevik, 68, Russian Federation
2 St. Petersburg State Agrarian University, 196601, St. Petersburg, Pushkin, Petersburg highway, 2, Russian Federation
* Corresponding author: tb280@mail.ru
The article is devoted to the study of the fire condition of a non-specialized car service, which is widespread mainly in agricultural areas. The assessment of compliance with the fire safety requirements of the protected object was carried out using a deterministic method and based on the calculation of fire risk. The calculation of the fire risk was carried out taking into account the absence of smoke protection at the facility and the non-compliance of the dimensions of doorways with the requirements of regulatory documents on fire safety. Calculations have shown that the value of an individual fire risk is 0,99∙10-7 per year, i.e. does not exceed the standard value (10-6 per year), established by Federal Law No. 123-FZ. Fire safety at the protected object is ensured.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.