Research on multi objective planning optimization of integrated energy system with economic and low carbon objectives
1
State Grid Zhenjiang Power Supply Company, Zhenjiang 212000, China
2
School of Economics and Management North China Electric Power University, Changping District, Beijing 102206, China
* Corresponding author: mayuzebj@163.com
In response to the global energy crisis, the integrated energy system has become an important part of the energy revolution. Aiming at the economic operation of the Integrated Energy System (IES), this paper proposes a system optimization planning model that takes the economic and environmental optimization as the goal and establishes a coupled capacity planning system, and jointly optimizes the capacity configuration and configuration of a single energy supply module. Power output to pursue maximum benefit. In order to illustrate the advantages of this method, on the basis of simulation, a dynamic programming method is used to solve the model. Finally, the simulation results show the effectiveness of the planning optimization model proposed in this paper, and provide a new path for solving the optimization problem of integrated energy system planning.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.