Issue |
E3S Web Conf.
Volume 218, 2020
2020 International Symposium on Energy, Environmental Science and Engineering (ISEESE 2020)
|
|
---|---|---|
Article Number | 02040 | |
Number of page(s) | 6 | |
Section | New Energy Development and Energy Sustainable Development Optimization | |
DOI | https://doi.org/10.1051/e3sconf/202021802040 | |
Published online | 11 December 2020 |
Research on Application of Project Management Maturity Model in Risk Management of Electrical Engineering
Shanghai DianJi University, Business Department, Shanghai, China
a Corresponding author: sjnzj@outlook.com
Based on the analysis of foreign classic maturity models and the actual situation of electrical engineering projects, this paper constructs a suitable three-dimensional project risk management maturity model and establishes a project risk management evaluation index system. Through fuzzy comprehensive evaluation method and analytic hierarchy process, the key element indicators are evaluated and weighted, and the maturity score is obtained, which finally reflects the maturity of project risk management. Finally, through empirical analysis, we found out the shortcomings of enterprise project risk management and proposed the direction for improvement.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.