Issue |
E3S Web Conf.
Volume 233, 2021
2020 2nd International Academic Exchange Conference on Science and Technology Innovation (IAECST 2020)
|
|
---|---|---|
Article Number | 03003 | |
Number of page(s) | 4 | |
Section | HCCE2020-Hydraulic, Civil and Construction Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202123303003 | |
Published online | 27 January 2021 |
Research on Cracking Control of Immersed Tube Tunnels Concrete by Pre-heating treatment
1 Key Laboratory of Durability Technology for Harbor and Marine Structure, Ministry of Communications, China
2 Shenzhen-Zhongshan Link Administration Center, Zhongshan, 528400, China.
* Corresponding author: yfang1@cccc4.com
Herein, the pre-heating treatments are researched. With diversity of zone and temperature, highest average temperature of the section 10cm below surface was 14.7°C, which is lower than that of the concrete block. And the distance of 20cm and 40cm to surface of section, the temperature is 11.8°C and 9.8°C, respectively. When the heating water of 60°C, the increase of 48h to 72h, the highest temperature is about 47.2°C and 49.6°C.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.