Issue |
E3S Web Conf.
Volume 331, 2021
International Conference on Disaster Mitigation and Management (ICDMM 2021)
|
|
---|---|---|
Article Number | 02016 | |
Number of page(s) | 5 | |
Section | Enhancing Framework for Disaster Preparedness | |
DOI | https://doi.org/10.1051/e3sconf/202133102016 | |
Published online | 13 December 2021 |
Analysis of wind power potential as an electricity source for safety light and sign on limestone mining hauling road
Andalas University, Electrical Engineering Department, 25163 Padang, West Sumatera - Indonesia
* Corresponding author: imran@eng.unand.ac.id
A work accident can occur anytime and anywhere to the worker if they take unsafe action and are in an unsafe condition. Mining areas located in the hills have unsafe conditions for operating heavy equipment, such as steep terrain conditions, slippery roads, and foggy weather, and lack of lighting. Installation of light assign is the right step in reducing work accidents at night, foggy and rainy weather. Measurement of wind data and calculation of wind potential statistically using Weibull distribution. The parameter values of scale and shape are 1.67 and 1,71 respectively, with an average wind speed of 1,49 m/s and the wind power potential of 3.14 W/m2. Based on measurement and analysis results, this quarry always gets wind gusts both day and night, so it has the potential to take advantage of wind energy either on a small turbine scale or in small and medium electric power.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.