Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 01023 | |
Number of page(s) | 4 | |
Section | Development, Utilization and Protection of Traditional Energy Resources | |
DOI | https://doi.org/10.1051/e3sconf/202123601023 | |
Published online | 09 February 2021 |
Construction and application of reservoir development measure benefit evaluation system
Onshore oilfield operation area of Petro China Jidong Oilfield, Tangshan, Hebei, China
The reservoir passes the peak of reserves.The reserves of new investment and development are decreasing year by year. The reserve resources are insufficient. Some of the main development units have entered the stage of secondary or tertiary oil recovery. The dependence of stable oil and gas production on measure production increases continuously. Under this background, the workload of oil well measures increases year by year. It is difficult to control the operation cost of measures. As a result, the overall economic benefits of oilfield enterprises have been declining year by year.The cost of ineffective measures has become an important factor restricting the economic development of oilfields. Through the construction of measures benefit evaluation system.Strengthen the controllability and predictability of each stage of implementation. Special attention should be paid to the pre control management of high cost wells and the transformation of production mode of low efficiency wells. Strictly follow the "ex ante argument, adjustment in matters, and post evaluation optimization" measures to run the management mode. Realize the reasonable allocation of workload and cost, and improve the effective rate of return of funds.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.