Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 02009 | |
Number of page(s) | 4 | |
Section | New Energy Technology and Clean Energy Production and Transformation | |
DOI | https://doi.org/10.1051/e3sconf/202123602009 | |
Published online | 09 February 2021 |
Research on optimization of single well testing workload and efficiency
The eighth oil production plant of daqing oil field, Daqing, Heilongjiang, China
corresponding author:phcy8@petrochina.com.cn
With the enlargement of production scale and the increase of survey and adjustment work, the mismatch between test requirement and test capability becomes more and more serious. In order to further control the test cost and improve the efficiency of survey and adjustment, according to the characteristics of the peripheral oil reservoirs and sections, differential management of survey and adjustment cycle and effective methods of matching injection points are actively carried out, on the basis of satisfying the development requirements and smooth operation of various indexes, solve the mismatch between test requirements and test capabilities. By analyzing the use cycle of test data under different conditions, the type of wells with extended use cycle is determined, which can effectively reduce the need of test work under the condition that the separate layer water injection is qualified. The distribution rules of different sizes of nozzles are statistically analyzed, and the selection rules of nozzles in special layers are made clear in advance to improve the debugging efficiency of injection allocation point.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.