Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 04032 | |
Number of page(s) | 5 | |
Section | Green Technology Innovation and Intelligent Application of Environmental Equipment | |
DOI | https://doi.org/10.1051/e3sconf/202123604032 | |
Published online | 09 February 2021 |
The design and development of sustainable office building base on the upgraded target in Shanghai
School of Civil and Traffic Engineering, Shanghai Urban Construction Vocational College, Yangpu, Shanghai, 200438, China
* Corresponding author’s e-mail: liangxiaodan@succ.edu.cn
Shanghai, which is the heart of economical centre in china, is developing even faster. The office building is perhaps the most important kind of building type along with the economic development trend. This paper study the design and development of the representative sustainable office building cases in different developing stage in Shanghai from the perspective of architectural design. And conclude the effective sustainable design and management ways by the cases to summarize some references and suggestion of sustainable office. And then the reflecting on the pre-preparation, the controlling of process and the technology selection in the whole design of the sustainable office building in Shanghai.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.