Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 05008 | |
Number of page(s) | 6 | |
Section | Urban Environmental Architecture and Digital Design Application | |
DOI | https://doi.org/10.1051/e3sconf/202123605008 | |
Published online | 09 February 2021 |
Research and development of comprehensive safety management system for super-tall buildings in Shanghai
1 Shanghai Urban Construction Vocational College, Shanghai, 201415
2 Shanghai Natural Resources Registration Center, Shanghai, 200003
Corresponding author’s e-mail: 13764434272@126.com
In order to meet the requirements of comprehensive safety management of super-tall buildings, a set of integrated safety management system is developed, which can be popularized and demonstrated, including three subsystems of structure, enclosure and firefighting. Interfaces are reserved for water supply and drainage, facilities and equipment, strong and weak electricity and other building safety management subsystems, which can realize the functions of comprehensive safety assessment, safety early warning, Internet of things safety monitoring and data analysis of super-tall buildings. Through the demonstration application in Shanghai Center, it is eventually proved that the system is feasible and effective.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.