Issue |
E3S Web Conf.
Volume 245, 2021
2021 5th International Conference on Advances in Energy, Environment and Chemical Science (AEECS 2021)
|
|
---|---|---|
Article Number | 02016 | |
Number of page(s) | 4 | |
Section | Environmental Resource Protection and Pollution Control | |
DOI | https://doi.org/10.1051/e3sconf/202124502016 | |
Published online | 24 March 2021 |
Discussion on construction scheme of aqueduct structure repair and water stop belt replacement in South-to-North Water Diversion project
1 Central Route Construction Management Bureau of South to North Water Transfer Project, Beijing 100053, China )
2 Engineering Research Center of Building Inspection and Reinforcement, Ministry of Education, Wuhan University, Wuhan, Hubei 430072, China
3 WuDa Jucheng Structure Co., Ltd., Wuhan, Hubei 430223, China
* Corresponding author: 124411319@qq.com
Taking Shahe and Dalang River aqueducts as an example, this paper introduces a movable and reusable waterproof device for aqueduct construction, which is suitable for construction scheme of structure repair and waterstop belt replacement for large-scale water delivery aqueduct of Shahe River and Dalang River in South-to-North Water Diversion Project. It aims to solve structural damage and waterstop belt leakage of the aqueducts of Shahe River and Dalang River in the South-to-North Water Diversion Project, realizing the aqueduct construction with uninterrupted water supply, and structure repair and waterstop belt replacement in the waterless environment separated by watertight device in the aqueduct construction.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.